Studio W worked with Red Hook Capital Partners to develop an elementary school campus for Scholarship PREP Public Schools. The campus occupies a site that is under an acre in size, so efficiency was key to provide their requested program, including a main building, covered lunch shelter and play yard space. The play yard design incorporated drop-off lanes as dual-use areas that become part of the play yard during school hours. The main building consists of administration, support spaces and 17 classrooms to support 450 students in grades TK-4th.

The campus is located on a large arterial street less than a mile from the original campus that was co-locating with a church. The design of the school reflects the urban setting by connecting the facades of the main building and the lunch shelter to create a physical separation of the main play yard. The materials included perforated metal, metal and cementitious panels, along with traditional smooth plaster to provide texture and variation across the building.

CLIENT

Red Hook Capital Partners

BUILDING AREA

18,141 SF

CONSTRUCTION COST

$7.8 million

STATUS

Completed 2022

Dwyer Middle School Phase 1 Modernization

Seacliff Elementary School Modernization

Moffett Elementary School Phase 1 Modernization