The Natomas High School Pool Modernization project included replacing the existing pool deck, plus retiling and replasting the existing pool. The project replaced the existing gas-fired boiler, pool filters, ADA lift and lifeguard station. Natural turf was replaced with artificial turf and six new tri-sail shades were added, along with new paint featured at the existing locker room building.

This upgraded aquatics facility transformed Natomas High School’s aging pool into a modernized facility with a high efficiency mechanical system to meet the needs of the school’s aquatic program.

CLIENT

Natomas Unified School District

BUILDING AREA

10,035 SF

CONSTRUCTION COST

$2.9 million

STATUS

Completed 2026